$44,233

Year 1 Actual Savings

10 Months

Actual Payback Period

30 Floors

160 Units

Co-op

Steam PTAC

Avalon Clinton South is a PTAC building in New York City with glass windows and a reddish brown exterior.

$145,245

Year 1 Actual Savings

9 Months

Actual Payback Period

24 Floors

288 Units

Rental

Hot Water PTAC

Rene Rivera -
Resident Manager for Douglas Elliman

“The alarms and alerts Parity gives me are like a security blanket. I have an extra set of eyes on my HVAC systems operations, even when I’m not at the building. Plus, we outperformed our savings guarantee. I highly recommend Parity to other Resident Managers.”

201 East 79th Street is a white brick fan coil NYC co-op building.

$104,003

Year 1 Actual Savings

8 Months

Actual Payback Period

20 Floors

168 Units

Co-op

2-Pipe Fan Coil

401 East 86th Street is a white brick fan coil NYC co-op building.

$107,217

Year 1 Actual Savings

2 Months

Actual Payback Period

19 Floors

229 Units

Co-op

2-Pipe Fan Coil

525 West 52nd Street is a NYC rental building with heat pump HVAC systems.

$67,702

Year 1 Actual Savings

11 Months

Actual Payback Period

24 Floors

392 Units

Rental

Water Source Heat Pumps

Gerald Rivera -
Senior VP Managing Director at Halstead Management Company

“LL84 triggered a lot of things. The buildings I managed started replacing the incandescent fixtures with LEDs. Then came along Parity. Parity’s product is amazing. It doesn’t take anyone with a lot of common sense to realize how great it is.”

1020 Grand Concourse is a white brick fan coil NYC co-op building.

$67,603

Year 1 Actual Savings

12 Months

Actual Payback Period

23 Floors

453 Units

Co-op

2-Pipe Fan Coil

155 East 34th Street is a white brick fan coil NYC co-op building.

$80,575

Year 1 Actual Savings

8 Months

Actual Payback Period

19 Floors

330 Units

Condo